WASSEF has been contracted to perform project management services for the U.S. Embassy Office Building (Cairo 1). Services were confined to the construction of the low rise buildings and the foundations, basement and lower four floors of the tower. WASSEF ensured that the construction met the U.S. National Building code and local Egyptian regulations, and gave top priority to health, safety and security. Both local materials and those imported from the U.S were used.

Client

Federal Bureau Operations (FBO), U.S. State Department

Size

30,000 SQM

Location

Qasr El Nil

Date of Completion

1985

Lead Architect

Metcalf and Associates

Scope

Project Management and Construction Supervision